Construction activity: SESP third floor medical equipment delivery

(SACRAMENTO)

On Monday, September 21, medical equipment shipment will arrive at 7 a.m. and be transported from the loading dock bay 1 and 2 through designated hospital corridors to the third floor SESP OR35.

Graphic denoting loading dock bay 1 and 2.
Offloading area.

The medical equipment will be delivered via semi‑truck, uncrated in the designated laydown area and transported into the hospital through double door entry path.

Please note the following details of the activity:

  • All personnel will be gowned once inside the building.

  • The equipment will be transferred through elevators 88 and 89 only.

Third floor path of travel.
Third floor travel path.

For further assistance, please contact Rudolph and Sletten project engineer intern Andy Xatkoun at andy.xatkoun@rsconst.com.