Parking Structure 7

Located adjacent to the M.I.N.D. Institute and Kiwanis Family House.

Photo of Parking Structure 7 exterior

Project Synopsis

Parking Structure 7 is five-level parking structure located at the southeast end of the Sacramento Campus, built over the existing Parking Lot 25 and directly adjacent to the M.I.N.D. Institute and Kiwanis Family House. Parking Structure 7 will be dedicated to staff parking, supporting the continuing growth of the Sacramento Campus.

Project Description

Parking Structure 7 provides 1,257 parking stalls with 64 electric vehicle charging stalls. The entry of Parking Structure 7 will be isolated from the M.I.N.D. Institute access and Parking Lot 25 is reconfigured with a parking dedicated to M.I.N.D. and auxiliary surface parking provided in front of the structure. The structure also features photovoltaic panels, landscaped avenue to 50th St, bicycle enclosure and a large curbside shuttle stop at 50th St.

Key Stats

Contractor: McCarthy Building Companies, Inc.
Design Firm: Choate Parking Consultants
CM: Cambridge CM
Delivery Method: Design Build
Square Footage: 380,590
Project Cost: $66 million
Construction Start: May 2024 
Estimated Completion: October 2025