| Project No. | Project Name | Delivery Method | Cost Estimate ($) | NTP Date | Contractor | Bid Amount |
| JOC-2024 | JOC General Contractor (Job orders $300K-$1M) | JOC | Up to $5,000,000 | 04/21/25 | Exbon Development | AF 1.2200/1.2000 |
| 9579370 | DT 0741A PO&M Reconfigure Space | Design-Bid-Build | $424,000 | 07/07/25 | RCP Construction | $274,469 |
| 9558120 | SESP 1P552 Cath Lab Remodel | Design-Build | $4,500,000 | 07/16/25 | Truebeck Construction | $4,450,000 |
| 9557240 | Central Plant Emissions Urea Project | Design-Bid-Build | $1,485,759 | 09/29/25 | Performance Mechanical | $1,533,795 |
| 9557750 | DT10 PICU Ceiling Tile & Boom Replacement | Design-Bid-Build | $5,500,000 | 10/15/25 | DPR Construction | $4,447,445 |
| 9558960 | East Wing Tower & Radiology SPC 4D Compliance | Design-Bid-Build | $1,200,000 | 01/16/26 | Roebbelen Contracting | $841,674 |
| 9558910 | Davis Tower #0711/0762 Pharmacy Remodel | Design-Bid-Build | $4,435,521 | 01/26/26 | Truebeck Construction | $2,936,555 |
| 9557740 | SESP 1P742 1P745 CT Scanner Replacement | Design-Bid-Build | $2,900,000 | 02/09/26 | Roebbelen Contracting | $2,718,000 |
| 9557960 | Central Plant Repair Steam Condensate System Supports | Design-Bid-Build | $2,000,000 | 02/10/26 | ACCO Engineered Systems | $1,384,874 |
| JOC 2026 | General Contractor Job Orders under $300K | JOC | Up to $5M | 02/11/26 | Streamline Construction | AF 1.3144/1.2944 |
| 9579550 | SESP 1P831 ER Additional Outlets | Design-Bid-Build | $105,000 | 02/25/26 | Roebbelen Contracting | $57,059 |
| 9560140 | SESP 2P340 Pathology Lab Remodel | Design-Build | $1,100,000 | 04/01/26 | Truebeck Construction | $1,047,231 |
| M056973 | SESP OR PO&M Flooring Replacement | Design-Bid-Build | $60,000 | 04/16/26 | Streamline Construction | $54,029 |